Zum Hauptinhalt wechseln
Englisch
Deutsch
Schritt 4
Line up a 1 ft strut channel with a u-bracket to the vertical strut channel. Put two spring strut channel nuts into the vertical strut channel. Insert two washers and screws into the u-bracket to hold the strut channel arm. Use the impact driver to tighten the screws.
Attaching the strut channel arm
  • Line up a 1 ft strut channel with a u-bracket to the vertical strut channel.

  • Put two spring strut channel nuts into the vertical strut channel. Insert two washers and screws into the u-bracket to hold the strut channel arm.

  • Use the impact driver to tighten the screws.

  • This is a what the final node holding structure looks like.

Hier Übersetzung einfügen

Hier Übersetzung einfügen

Hier Übersetzung einfügen

Hier Übersetzung einfügen

Deine Beiträge sind lizenziert unter der Open-Source Creative Commons Lizenz.