Zum Hauptinhalt wechseln

Repariere deine Sachen

Recht auf Reparatur

Store

Englisch
Deutsch

Schritt 11 übersetzen

Schritt 11
Place the bottom pins into the pin holes until the top of the new pin matches the shear line. Pins that are in the correct position will be flush with the shear line.  Incorrect pin placement will be above or below the shear line.  The red circle displays an incorrect placement as the pin is above the shear line. Pins that are in the correct position will be flush with the shear line.  Incorrect pin placement will be above or below the shear line.  The red circle displays an incorrect placement as the pin is above the shear line.
  • Place the bottom pins into the pin holes until the top of the new pin matches the shear line.

  • Pins that are in the correct position will be flush with the shear line. Incorrect pin placement will be above or below the shear line. The red circle displays an incorrect placement as the pin is above the shear line.

Hier Übersetzung einfügen

Hier Übersetzung einfügen

Deine Beiträge sind lizenziert unter der Open-Source Creative Commons Lizenz.