Zum Hauptinhalt wechseln
Gemeinsam reparieren - Jetzt registrieren

Yuneec Typhoon Q500 4K Bottom Frame Replacement

Was du brauchst

    1. Yuneec Typhoon Q500 4K Bottom Frame Replacement, Leg: Schritt 1, Bild 1 von 2 Yuneec Typhoon Q500 4K Bottom Frame Replacement, Leg: Schritt 1, Bild 2 von 2
      • Flip the drone upside down.

      • Use a 2 mm Hex screwdriver to remove the two screws that secure the legs to the drone.

      Frag FixBot

      Kommentar hinzufügen

    2. Yuneec Typhoon Q500 4K Bottom Frame Replacement: Schritt 2, Bild 1 von 2 Yuneec Typhoon Q500 4K Bottom Frame Replacement: Schritt 2, Bild 2 von 2
      • Turn the drone to the side so that you can get better grip.

      • Put both thumbs on the plastic clamp and detach the legs from the main body.

      • While removing the legs remember to push the whole piece in a forward upward motion.

      • Repeat same steps for other leg.

      Frag FixBot

      Kommentar hinzufügen

    1. Yuneec Typhoon Q500 4K Bottom Frame Replacement, Bottom Frame: Schritt 3, Bild 1 von 2 Yuneec Typhoon Q500 4K Bottom Frame Replacement, Bottom Frame: Schritt 3, Bild 2 von 2
      • Use one hand to hold drone and other to hold camera, then slide the camera off the body of the drone.

      Frag FixBot

      Kommentar hinzufügen

    2. Yuneec Typhoon Q500 4K Bottom Frame Replacement: Schritt 4, Bild 1 von 3 Yuneec Typhoon Q500 4K Bottom Frame Replacement: Schritt 4, Bild 2 von 3 Yuneec Typhoon Q500 4K Bottom Frame Replacement: Schritt 4, Bild 3 von 3
      • Use a TR6 Torx screwdriver to remove the screws connected to the bottom frame.

      • Use a TR8 Torx screwdriver to remove the screws located at the center frame.

      • Use a TR6 Torx screwdriver to remove the screws connecting the center frame to the propellers.

      Frag FixBot

      Kommentar hinzufügen

Abschluss

To reassemble your device, follow these instructions in reverse order.

Rückgängig: Ich habe diese Anleitung nicht absolviert.

Eine weitere Person hat diese Anleitung absolviert.

Team

Cuesta, Team 10-5, Krynen Fall 2024 Mitglied von Cuesta, Team 10-5, Krynen Fall 2024

CUESTA-KRYNEN-F24S10G5

4 Mitglieder

72 Anleitungen geschrieben

1 Kommentar zur Anleitung

Wow I absolutely should say that that is one of the least complete guides I have ever had the pleasure of viewing.

"Install the new frame securely, ensuring proper alignment and connections"

What connections? Surely you don't mean the electrical connections for the components that are secured to the lower frame on the inside that must be removed and located on the new air frame.

"Verify that all parts are properly secured to maintain stability"

As simple as this task is for most people the individual who's seeking this information may not have the ability to predict how tight the screws that secure the main board should be before they are damaged.

All I'm saying is that giving the reputation that this site and it's community has been able to create over the years allowing this guide to be posted is the equivalent to regression.

Gene Hewett - Antwort Teilen

Kommentar hinzufügen

Seitenaufrufe:

Letzte 24 Stunden: 1

Letzte 7 Tage: 3

Letzte 30 Tage: 31

Insgesamt: 422