[title] Preparing and setting first strut channel
-[* black] Clear large rocks from the streambed to make it easier to install the strut channel.
+[* yellow] Clear large rocks from the streambed to make it easier to install the strut channel.
[* icon_note] Place cleared rocks downstream so they do not damage the node during a storm.
-[* black] Set 5 ft steel strut channel into place.
+[* blue] Set 5 ft steel strut channel into place.
[* icon_note] Ensure the open side of the strut channel faces south so that the solar panel receives maximum sunlight!
-[* black] Use the post pounder to drive the strut channel 3 ft into the stream bed.
+[* green] Use the post pounder to drive the strut channel 3 ft into the stream bed.