Zum Hauptinhalt wechseln

Änderungen an Schritt Nr. 1

Bearbeitet von Brooke Mason -

Bearbeitung genehmigt von Brooke Mason

Vorher
Nachher
Unverändert

Schritt-Zeilen

[title] Preparing and setting first strut channel
[* black] Clear large rocks from the streambed to make it easier to install the strut channel.
[* icon_note] Place cleared rocks downstream so they do not damage the node during a storm.
[* black] Set 5 ft steel strut channel into place.
+[* icon_note] Ensure the open side of the strut channel faces south so that the solar panel receives maximum sunlight!
[* black] Use the post pounder to drive the strut channel 3 ft into the stream bed.