Zum Hauptinhalt wechseln

Änderungen an Schritt Nr. 4

Bearbeitet von Brooke Mason -

Bearbeitung genehmigt von Brooke Mason

Vorher
Nachher
Unverändert

Schritt-Zeilen

-[title] Attach strut channel arm
+[title] Attaching the strut channel arm
[* yellow] Line up a 1 ft strut channel with a u-bracket to the vertical strut channel.
[* black] Put two spring strut channel nuts into the vertical strut channel. Insert two washers and screws into the u-bracket to hold the strut channel arm.
[* blue] Use the impact driver to tighten the screws.
[* green] This is a what the final node holding structure looks like.