Schritt 4 übersetzen
Schritt 4
-
Label and pull off the connectors to the warning light just right where the switches used to be.
-
There is one upper and one lower, divided by a plastic tab.
-
Next, unscrew the tab securing the grounding wire and the water hose to the top of the boiler.
Deine Beiträge sind lizenziert unter der Open-Source Creative Commons Lizenz.