Schritt 9 übersetzen
Schritt 9
-
Left of the boiler and a little hard to reach sits connector no. 19 (if you followed my labelling method) once again on a ducty thing.
-
Right next to it, you can see the Over Pressure Valve Assembly (with the black hose coming out of the top)
Deine Beiträge sind lizenziert unter der Open-Source Creative Commons Lizenz.