Schritt 13 übersetzen
Schritt 13
-
After peering into the heart of the Mate 9, we calm down a little and proceed with the more mundane removal of the motherboard flex cable and some connectors.
-
A daughterboard falls into our hands, and with tears in our eyes, we see—the USB-C port is soldered to it.
[* black] After peering into the heart of the Mate 9, we calm down a little and proceed with the more mundane removal of the motherboard flex cable and some connectors. | |
[* black] A daughterboard falls into our hands, and with tears in our eyes, we see—the USB-C port is soldered to it. | |
[* icon_note] Nevertheless, this port is responsible for fully charging the Mate 9 in 90 minutes. Pretty nifty, as long as you don't wear it out. | |
+ | [* icon_note] Two MEMS microphones and likely an antenna tuner is seen on this side of the daughterboard. |
Deine Beiträge sind lizenziert unter der Open-Source Creative Commons Lizenz.